Deck and patio installation guide

solive
  • Build structure with pressure-treated wood or
    another material.
  • Joists should be installed at a maximum interval
    of 16" O.C.
  • Plan for a local building code compliant deck slope.
  • Validate your installation plan with your local
    building code.
  • It is possible to protect or stain heat-treated wood before installation (see "Finish" section for details).


  • Install pieces of heat-treated wood on the structure leaving a 1/8" gap between boards to allow water and other liquids to flow through.
  • Fasten boards to structure using exterior screws or nails or any other compliant fastening system available at your local dealer.
installation<
Angle Max Space
90 16" O.C.
60 14" O.C.
45 12" O.C.
30 8" O.C.


» Contact us for more information.

» Download PDF téléchargez en PDF

 

heat treated wood
heat treated wood
Site map |  GrifGrafik.com
Thermo-transformation is smart!
Bois Écologique All Rights Reserved*